Stations · London
Abbey WoodABW
3 operators · Elizabeth line, Great Northern, Thameslink, Southern and Gatwick Express (GTR), Southeastern
98
Reliabilitybeats 91%
Cancellationsbeats 49%
Frequencybeats 98%
Connectivitybeats 98%
Overall48 of 2,435
Arrive within 3 min
93.2%
National average 84.3%
Stops cancelled
2.7%
National average 3.1%
Trains per day
529
192,645 scheduled stops
Data coverage
97.3%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 94.8% |
| Sept 2025 | 92.8% |
| Sept 2025 | 92.4% |
| Oct 2025 | 92.8% |
| Nov 2025 | 92.2% |
| Dec 2025 | 95.2% |
| Jan 2026 | 94% |
| Feb 2026 | 93.7% |
| Mar 2026 | 93% |
| Apr 2026 | 93.8% |
| May 2026 | 93% |
| Jun 2026 | 91.1% |
| Jul 2026 | 92.7% |
Details
| Region | London |
| Station facility owner | Elizabeth line |
| Operators calling | Elizabeth lineGreat Northern, Thameslink, Southern and Gatwick Express (GTR)Southeastern |
| Annual entries and exits | 11,873,686 |
| Annual interchanges | 1,879,075 |
| Scheduled stops | 192,645 |
| Measured stops | 187,377 |