HGIYS
Stations · South East

Ascot (Berks)ACT

1 operator · South Western Railway
96
Reliabilitybeats 82%
Cancellationsbeats 62%
Frequencybeats 83%
Connectivitybeats 90%
Overall91 of 2,435
Arrive within 3 min
91.3%
National average 84.3%
Stops cancelled
2.2%
National average 3.1%
Trains per day
146
53,155 scheduled stops
Data coverage
97.8%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.1%Sept 2025 · 90.4%Sept 2025 · 90.1%Oct 2025 · 87.1%Nov 2025 · 87.5%Dec 2025 · 92.2%Jan 2026 · 93%Feb 2026 · 93.1%Mar 2026 · 93.6%Apr 2026 · 95%May 2026 · 91.2%Jun 2026 · 90.2%Jul 2026 · 91.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.1%
Sept 202590.4%
Sept 202590.1%
Oct 202587.1%
Nov 202587.5%
Dec 202592.2%
Jan 202693%
Feb 202693.1%
Mar 202693.6%
Apr 202695%
May 202691.2%
Jun 202690.2%
Jul 202691.7%

Details

RegionSouth East
Station facility ownerSouth Western Railway
Operators calling
South Western Railway
Annual entries and exits947,036
Annual interchanges292,322
Scheduled stops53,155
Measured stops51,968