Stations · South East
AldershotAHT
1 operator · South Western Railway
97
Reliabilitybeats 83%
Cancellationsbeats 66%
Frequencybeats 90%
Connectivitybeats 88%
Overall74 of 2,435
Arrive within 3 min
91.4%
National average 84.3%
Stops cancelled
2.1%
National average 3.1%
Trains per day
193
70,344 scheduled stops
Data coverage
97.9%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 94.7% |
| Sept 2025 | 89% |
| Sept 2025 | 93.6% |
| Oct 2025 | 86.2% |
| Nov 2025 | 89.2% |
| Dec 2025 | 91% |
| Jan 2026 | 94.8% |
| Feb 2026 | 93.8% |
| Mar 2026 | 95.4% |
| Apr 2026 | 93.1% |
| May 2026 | 89% |
| Jun 2026 | 88.9% |
| Jul 2026 | 88.2% |
Details
| Region | South East |
| Station facility owner | South Western Railway |
| Operators calling | South Western Railway |
| Annual entries and exits | 1,371,112 |
| Annual interchanges | 105,047 |
| Scheduled stops | 70,344 |
| Measured stops | 68,856 |