HGIYS
Stations · South East

AylesburyAYS

1 operator · Chiltern Railways
97
Reliabilitybeats 79%
Cancellationsbeats 92%
Frequencybeats 69%
Connectivitybeats 82%
Overall75 of 2,435
Arrive within 3 min
90.5%
National average 84.3%
Stops cancelled
1.2%
National average 3.1%
Trains per day
96
34,760 scheduled stops
Data coverage
98.8%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.3%Sept 2025 · 91.8%Sept 2025 · 89.9%Oct 2025 · 87.1%Nov 2025 · 85.5%Dec 2025 · 91.3%Jan 2026 · 92.4%Feb 2026 · 93.9%Mar 2026 · 93.7%Apr 2026 · 92.7%May 2026 · 88.6%Jun 2026 · 89.4%Jul 2026 · 89%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.3%
Sept 202591.8%
Sept 202589.9%
Oct 202587.1%
Nov 202585.5%
Dec 202591.3%
Jan 202692.4%
Feb 202693.9%
Mar 202693.7%
Apr 202692.7%
May 202688.6%
Jun 202689.4%
Jul 202689%

Details

RegionSouth East
Station facility ownerChiltern Railways
Operators calling
Chiltern Railways
Annual entries and exits900,484
Annual interchanges6,334
Scheduled stops34,760
Measured stops34,344