HGIYS
Stations · London

Battersea ParkBAK

3 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground, Southeastern
98
Reliabilitybeats 94%
Cancellationsbeats 53%
Frequencybeats 92%
Connectivitybeats 87%
Overall61 of 2,435
Arrive within 3 min
94.4%
National average 84.3%
Stops cancelled
2.5%
National average 3.1%
Trains per day
220
80,113 scheduled stops
Data coverage
97.4%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 95.7%Sept 2025 · 94%Sept 2025 · 93.6%Oct 2025 · 94.7%Nov 2025 · 94.5%Dec 2025 · 94.7%Jan 2026 · 93.2%Feb 2026 · 95.2%Mar 2026 · 94.1%Apr 2026 · 95.4%May 2026 · 94.2%Jun 2026 · 93.7%Jul 2026 · 94.8%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202595.7%
Sept 202594%
Sept 202593.6%
Oct 202594.7%
Nov 202594.5%
Dec 202594.7%
Jan 202693.2%
Feb 202695.2%
Mar 202694.1%
Apr 202695.4%
May 202694.2%
Jun 202693.7%
Jul 202694.8%

Details

RegionLondon
Station facility ownerGovia Thameslink Railway (Southern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)London OvergroundSoutheastern
Annual entries and exits2,183,506
Annual interchanges1,524
Scheduled stops80,113
Measured stops78,066