Stations · London
Battersea ParkBAK
3 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground, Southeastern
98
Reliabilitybeats 94%
Cancellationsbeats 53%
Frequencybeats 92%
Connectivitybeats 87%
Overall61 of 2,435
Arrive within 3 min
94.4%
National average 84.3%
Stops cancelled
2.5%
National average 3.1%
Trains per day
220
80,113 scheduled stops
Data coverage
97.4%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 95.7% |
| Sept 2025 | 94% |
| Sept 2025 | 93.6% |
| Oct 2025 | 94.7% |
| Nov 2025 | 94.5% |
| Dec 2025 | 94.7% |
| Jan 2026 | 93.2% |
| Feb 2026 | 95.2% |
| Mar 2026 | 94.1% |
| Apr 2026 | 95.4% |
| May 2026 | 94.2% |
| Jun 2026 | 93.7% |
| Jul 2026 | 94.8% |
Details
| Region | London |
| Station facility owner | Govia Thameslink Railway (Southern) |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR)London OvergroundSoutheastern |
| Annual entries and exits | 2,183,506 |
| Annual interchanges | 1,524 |
| Scheduled stops | 80,113 |
| Measured stops | 78,066 |