HGIYS
Stations · London

BalhamBAL

1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
98
Reliabilitybeats 92%
Cancellationsbeats 57%
Frequencybeats 95%
Connectivitybeats 90%
Overall46 of 2,435
Arrive within 3 min
93.7%
National average 84.3%
Stops cancelled
2.4%
National average 3.1%
Trains per day
314
114,438 scheduled stops
Data coverage
97.6%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 94.5%Sept 2025 · 93.9%Sept 2025 · 93.8%Oct 2025 · 93.8%Nov 2025 · 93.3%Dec 2025 · 93.4%Jan 2026 · 92.8%Feb 2026 · 94.1%Mar 2026 · 93.8%Apr 2026 · 94.4%May 2026 · 93.2%Jun 2026 · 92.7%Jul 2026 · 94%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202594.5%
Sept 202593.9%
Sept 202593.8%
Oct 202593.8%
Nov 202593.3%
Dec 202593.4%
Jan 202692.8%
Feb 202694.1%
Mar 202693.8%
Apr 202694.4%
May 202693.2%
Jun 202692.7%
Jul 202694%

Details

RegionLondon
Station facility ownerGovia Thameslink Railway (Southern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)
Annual entries and exits5,955,232
Annual interchanges267,295
Scheduled stops114,438
Measured stops111,691