HGIYS
Stations · East of England

BrundallBDA

1 operator · Greater Anglia
99
Reliabilitybeats 98%
Cancellationsbeats 100%
Frequencybeats 59%
Connectivitybeats 81%
Overall22 of 2,435
Arrive within 3 min
96.4%
National average 84.3%
Stops cancelled
0.4%
National average 3.1%
Trains per day
71
25,663 scheduled stops
Data coverage
97.2%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 97.2%Sept 2025 · 97.3%Sept 2025 · 96%Oct 2025 · 96.1%Nov 2025 · 97.6%Dec 2025 · 98%Jan 2026 · 97.9%Feb 2026 · 97.4%Mar 2026 · 97.8%Apr 2026 · 96.8%May 2026 · 96.9%Jun 2026 · 94.1%Jul 2026 · 90.8%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202597.2%
Sept 202597.3%
Sept 202596%
Oct 202596.1%
Nov 202597.6%
Dec 202598%
Jan 202697.9%
Feb 202697.4%
Mar 202697.8%
Apr 202696.8%
May 202696.9%
Jun 202694.1%
Jul 202690.8%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater Anglia
Annual entries and exits103,312
Annual interchanges1,154
Scheduled stops25,663
Measured stops24,936