Stations · Yorkshire and The Humber
Bradford Forster SquareBDQ
2 operators · London North Eastern Railway, Northern Trains
98
Reliabilitybeats 89%
Cancellationsbeats 70%
Frequencybeats 86%
Connectivitybeats 90%
Overall42 of 2,435
Arrive within 3 min
93.1%
National average 84.3%
Stops cancelled
2%
National average 3.1%
Trains per day
168
61,063 scheduled stops
Data coverage
98%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 94.2% |
| Sept 2025 | 94.6% |
| Sept 2025 | 94.4% |
| Oct 2025 | 91.2% |
| Nov 2025 | 89.1% |
| Dec 2025 | 91% |
| Jan 2026 | 91.9% |
| Feb 2026 | 94% |
| Mar 2026 | 95.1% |
| Apr 2026 | 94.2% |
| May 2026 | 93.5% |
| Jun 2026 | 93% |
| Jul 2026 | 93.9% |
Details
| Region | Yorkshire and The Humber |
| Station facility owner | Northern Trains |
| Operators calling | London North Eastern RailwayNorthern Trains |
| Annual entries and exits | 1,457,418 |
| Annual interchanges | 35,780 |
| Scheduled stops | 61,063 |
| Measured stops | 59,866 |