Stations · London
Bethnal GreenBET
2 operators · Greater Anglia, London Overground
97
Reliabilitybeats 89%
Cancellationsbeats 66%
Frequencybeats 95%
Connectivitybeats 74%
Overall70 of 2,435
Arrive within 3 min
92.9%
National average 84.3%
Stops cancelled
2.1%
National average 3.1%
Trains per day
287
104,551 scheduled stops
Data coverage
97.9%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 95.2% |
| Sept 2025 | 94% |
| Sept 2025 | 94.5% |
| Oct 2025 | 90.3% |
| Nov 2025 | 88.4% |
| Dec 2025 | 91.4% |
| Jan 2026 | 94.6% |
| Feb 2026 | 93.1% |
| Mar 2026 | 93% |
| Apr 2026 | 94.3% |
| May 2026 | 94.7% |
| Jun 2026 | 91.4% |
| Jul 2026 | 91.6% |
Details
| Region | London |
| Station facility owner | London Overground |
| Operators calling | Greater AngliaLondon Overground |
| Annual entries and exits | 1,564,066 |
| Annual interchanges | 0 |
| Scheduled stops | 104,551 |
| Measured stops | 102,359 |