HGIYS
Stations · East of England

Bishops StortfordBIS

1 operator · Greater Anglia
97
Reliabilitybeats 81%
Cancellationsbeats 60%
Frequencybeats 92%
Connectivitybeats 89%
Overall84 of 2,435
Arrive within 3 min
90.6%
National average 84.3%
Stops cancelled
2.3%
National average 3.1%
Trains per day
226
82,231 scheduled stops
Data coverage
97.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 90.7%Sept 2025 · 90.5%Sept 2025 · 93.3%Oct 2025 · 90.6%Nov 2025 · 86.8%Dec 2025 · 92.9%Jan 2026 · 91.6%Feb 2026 · 89.8%Mar 2026 · 90.1%Apr 2026 · 93%May 2026 · 92.7%Jun 2026 · 87.2%Jul 2026 · 88.1%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202590.7%
Sept 202590.5%
Sept 202593.3%
Oct 202590.6%
Nov 202586.8%
Dec 202592.9%
Jan 202691.6%
Feb 202689.8%
Mar 202690.1%
Apr 202693%
May 202692.7%
Jun 202687.2%
Jul 202688.1%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater Anglia
Annual entries and exits3,003,190
Annual interchanges123,676
Scheduled stops82,231
Measured stops80,338