HGIYS
Stations · South East

Bicester VillageBIT

1 operator · Chiltern Railways
97
Reliabilitybeats 87%
Cancellationsbeats 93%
Frequencybeats 60%
Connectivitybeats 79%
Overall71 of 2,435
Arrive within 3 min
92.9%
National average 84.3%
Stops cancelled
1.2%
National average 3.1%
Trains per day
72
26,280 scheduled stops
Data coverage
98.8%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.3%Sept 2025 · 90.4%Sept 2025 · 94.2%Oct 2025 · 93.3%Nov 2025 · 91.8%Dec 2025 · 94.3%Jan 2026 · 95.5%Feb 2026 · 95%Mar 2026 · 94.6%Apr 2026 · 93.9%May 2026 · 91.2%Jun 2026 · 91.1%Jul 2026 · 90.5%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.3%
Sept 202590.4%
Sept 202594.2%
Oct 202593.3%
Nov 202591.8%
Dec 202594.3%
Jan 202695.5%
Feb 202695%
Mar 202694.6%
Apr 202693.9%
May 202691.2%
Jun 202691.1%
Jul 202690.5%

Details

RegionSouth East
Station facility ownerChiltern Railways
Operators calling
Chiltern Railways
Annual entries and exits1,925,568
Annual interchanges219
Scheduled stops26,280
Measured stops25,972