HGIYS
Stations · London

BarkingBKG

2 operators · London Overground, c2c
100
Reliabilitybeats 92%
Cancellationsbeats 69%
Frequencybeats 98%
Connectivitybeats 97%
Overall12 of 2,435
Arrive within 3 min
93.5%
National average 84.3%
Stops cancelled
2%
National average 3.1%
Trains per day
436
158,509 scheduled stops
Data coverage
98%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 93.7%Sept 2025 · 91.6%Sept 2025 · 93.5%Oct 2025 · 92.6%Nov 2025 · 92.7%Dec 2025 · 92.1%Jan 2026 · 94.9%Feb 2026 · 95%Mar 2026 · 95.7%Apr 2026 · 94.6%May 2026 · 93.3%Jun 2026 · 91.9%Jul 2026 · 93.1%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202593.7%
Sept 202591.6%
Sept 202593.5%
Oct 202592.6%
Nov 202592.7%
Dec 202592.1%
Jan 202694.9%
Feb 202695%
Mar 202695.7%
Apr 202694.6%
May 202693.3%
Jun 202691.9%
Jul 202693.1%

Details

RegionLondon
Station facility ownerc2c
Operators calling
London Overgroundc2c
Annual entries and exits13,359,426
Annual interchanges1,162,662
Scheduled stops158,509
Measured stops155,287