HGIYS
Stations · London

Bromley NorthBMN

1 operator · Southeastern
96
Reliabilitybeats 100%
Cancellationsbeats 99%
Frequencybeats 58%
Connectivitybeats 35%
Overall97 of 2,435
Arrive within 3 min
99.4%
National average 84.3%
Stops cancelled
0.5%
National average 3.1%
Trains per day
70
25,496 scheduled stops
Data coverage
99.5%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 99.7%Sept 2025 · 99.7%Sept 2025 · 99.6%Oct 2025 · 99.2%Nov 2025 · 98.3%Dec 2025 · 99.6%Jan 2026 · 99.2%Feb 2026 · 99.3%Mar 2026 · 99.4%Apr 2026 · 99.3%May 2026 · 99.3%Jun 2026 · 99.4%Jul 2026 · 99.8%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202599.7%
Sept 202599.7%
Sept 202599.6%
Oct 202599.2%
Nov 202598.3%
Dec 202599.6%
Jan 202699.2%
Feb 202699.3%
Mar 202699.4%
Apr 202699.3%
May 202699.3%
Jun 202699.4%
Jul 202699.8%

Details

RegionLondon
Station facility ownerSoutheastern
Operators calling
Southeastern
Annual entries and exits226,164
Annual interchanges0
Scheduled stops25,496
Measured stops25,374