Stations · London
Bromley NorthBMN
1 operator · Southeastern
96
Reliabilitybeats 100%
Cancellationsbeats 99%
Frequencybeats 58%
Connectivitybeats 35%
Overall97 of 2,435
Arrive within 3 min
99.4%
National average 84.3%
Stops cancelled
0.5%
National average 3.1%
Trains per day
70
25,496 scheduled stops
Data coverage
99.5%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 99.7% |
| Sept 2025 | 99.7% |
| Sept 2025 | 99.6% |
| Oct 2025 | 99.2% |
| Nov 2025 | 98.3% |
| Dec 2025 | 99.6% |
| Jan 2026 | 99.2% |
| Feb 2026 | 99.3% |
| Mar 2026 | 99.4% |
| Apr 2026 | 99.3% |
| May 2026 | 99.3% |
| Jun 2026 | 99.4% |
| Jul 2026 | 99.8% |
Details
| Region | London |
| Station facility owner | Southeastern |
| Operators calling | Southeastern |
| Annual entries and exits | 226,164 |
| Annual interchanges | 0 |
| Scheduled stops | 25,496 |
| Measured stops | 25,374 |