HGIYS
Stations · Scotland

Bishopton (Renfrewshire)BPT

1 operator · ScotRail
96
Reliabilitybeats 98%
Cancellationsbeats 90%
Frequencybeats 75%
Connectivitybeats 35%
Overall92 of 2,435
Arrive within 3 min
96%
National average 84.3%
Stops cancelled
1.3%
National average 3.1%
Trains per day
124
45,248 scheduled stops
Data coverage
98.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 97.7%Sept 2025 · 94.4%Sept 2025 · 96.4%Oct 2025 · 95.6%Nov 2025 · 94.7%Dec 2025 · 94.6%Jan 2026 · 97%Feb 2026 · 94.8%Mar 2026 · 97.5%Apr 2026 · 96.8%May 2026 · 95%Jun 2026 · 96.6%Jul 2026 · 96.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202597.7%
Sept 202594.4%
Sept 202596.4%
Oct 202595.6%
Nov 202594.7%
Dec 202594.6%
Jan 202697%
Feb 202694.8%
Mar 202697.5%
Apr 202696.8%
May 202695%
Jun 202696.6%
Jul 202696.7%

Details

RegionScotland
Station facility ownerScotRail
Operators calling
ScotRail
Annual entries and exits701,908
Annual interchanges0
Scheduled stops45,248
Measured stops44,655