Stations · Scotland
Bishopton (Renfrewshire)BPT
1 operator · ScotRail
96
Reliabilitybeats 98%
Cancellationsbeats 90%
Frequencybeats 75%
Connectivitybeats 35%
Overall92 of 2,435
Arrive within 3 min
96%
National average 84.3%
Stops cancelled
1.3%
National average 3.1%
Trains per day
124
45,248 scheduled stops
Data coverage
98.7%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 97.7% |
| Sept 2025 | 94.4% |
| Sept 2025 | 96.4% |
| Oct 2025 | 95.6% |
| Nov 2025 | 94.7% |
| Dec 2025 | 94.6% |
| Jan 2026 | 97% |
| Feb 2026 | 94.8% |
| Mar 2026 | 97.5% |
| Apr 2026 | 96.8% |
| May 2026 | 95% |
| Jun 2026 | 96.6% |
| Jul 2026 | 96.7% |
Details
| Region | Scotland |
| Station facility owner | ScotRail |
| Operators calling | ScotRail |
| Annual entries and exits | 701,908 |
| Annual interchanges | 0 |
| Scheduled stops | 45,248 |
| Measured stops | 44,655 |