HGIYS
Stations · London

ChingfordCHI

1 operator · London Overground
97
Reliabilitybeats 99%
Cancellationsbeats 85%
Frequencybeats 82%
Connectivitybeats 35%
Overall85 of 2,435
Arrive within 3 min
96.7%
National average 84.3%
Stops cancelled
1.5%
National average 3.1%
Trains per day
143
52,206 scheduled stops
Data coverage
98.5%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 97.9%Sept 2025 · 97.5%Sept 2025 · 98%Oct 2025 · 95.5%Nov 2025 · 93.3%Dec 2025 · 96.4%Jan 2026 · 98.2%Feb 2026 · 95.9%Mar 2026 · 97.9%Apr 2026 · 96.7%May 2026 · 97.5%Jun 2026 · 96.4%Jul 2026 · 95.8%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202597.9%
Sept 202597.5%
Sept 202598%
Oct 202595.5%
Nov 202593.3%
Dec 202596.4%
Jan 202698.2%
Feb 202695.9%
Mar 202697.9%
Apr 202696.7%
May 202697.5%
Jun 202696.4%
Jul 202695.8%

Details

RegionLondon
Station facility ownerLondon Overground
Operators calling
London Overground
Annual entries and exits2,036,058
Annual interchanges0
Scheduled stops52,206
Measured stops51,433