Stations · East of England
CheshuntCHN
2 operators · Greater Anglia, London Overground
97
Reliabilitybeats 77%
Cancellationsbeats 61%
Frequencybeats 95%
Connectivitybeats 95%
Overall79 of 2,435
Arrive within 3 min
89.6%
National average 84.3%
Stops cancelled
2.3%
National average 3.1%
Trains per day
288
104,676 scheduled stops
Data coverage
97.7%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 93.3% |
| Sept 2025 | 92% |
| Sept 2025 | 93.6% |
| Oct 2025 | 89.2% |
| Nov 2025 | 86.1% |
| Dec 2025 | 91.7% |
| Jan 2026 | 90.5% |
| Feb 2026 | 88.1% |
| Mar 2026 | 88.3% |
| Apr 2026 | 91% |
| May 2026 | 90.8% |
| Jun 2026 | 85.5% |
| Jul 2026 | 84.9% |
Details
| Region | East of England |
| Station facility owner | Greater Anglia |
| Operators calling | Greater AngliaLondon Overground |
| Annual entries and exits | 2,547,310 |
| Annual interchanges | 314,476 |
| Scheduled stops | 104,676 |
| Measured stops | 102,283 |