HGIYS
Stations · East of England

CheshuntCHN

2 operators · Greater Anglia, London Overground
97
Reliabilitybeats 77%
Cancellationsbeats 61%
Frequencybeats 95%
Connectivitybeats 95%
Overall79 of 2,435
Arrive within 3 min
89.6%
National average 84.3%
Stops cancelled
2.3%
National average 3.1%
Trains per day
288
104,676 scheduled stops
Data coverage
97.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 93.3%Sept 2025 · 92%Sept 2025 · 93.6%Oct 2025 · 89.2%Nov 2025 · 86.1%Dec 2025 · 91.7%Jan 2026 · 90.5%Feb 2026 · 88.1%Mar 2026 · 88.3%Apr 2026 · 91%May 2026 · 90.8%Jun 2026 · 85.5%Jul 2026 · 84.9%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202593.3%
Sept 202592%
Sept 202593.6%
Oct 202589.2%
Nov 202586.1%
Dec 202591.7%
Jan 202690.5%
Feb 202688.1%
Mar 202688.3%
Apr 202691%
May 202690.8%
Jun 202685.5%
Jul 202684.9%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater AngliaLondon Overground
Annual entries and exits2,547,310
Annual interchanges314,476
Scheduled stops104,676
Measured stops102,283