Stations · London
Clapham JunctionCLJ
3 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground, South Western Railway
76
Reliabilitybeats 53%
Cancellationsbeats 20%
Frequencybeats 100%
Connectivitybeats 99%
Overall581 of 2,435
Arrive within 3 min
84.9%
National average 84.3%
Stops cancelled
4%
National average 3.1%
Trains per day
1,957
712,248 scheduled stops
Data coverage
95.9%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 87.2% |
| Sept 2025 | 86.1% |
| Sept 2025 | 85.4% |
| Oct 2025 | 80.4% |
| Nov 2025 | 78.4% |
| Dec 2025 | 82.5% |
| Jan 2026 | 85.7% |
| Feb 2026 | 86% |
| Mar 2026 | 88.8% |
| Apr 2026 | 88.2% |
| May 2026 | 83.4% |
| Jun 2026 | 85.1% |
| Jul 2026 | 85.1% |
Details
| Region | London |
| Station facility owner | Network Rail |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR)London OvergroundSouth Western Railway |
| Annual entries and exits | 24,447,510 |
| Annual interchanges | 20,404,411 |
| Scheduled stops | 712,248 |
| Measured stops | 683,330 |