HGIYS
Stations · London

Clock HouseCLK

1 operator · Southeastern
99
Reliabilitybeats 94%
Cancellationsbeats 91%
Frequencybeats 77%
Connectivitybeats 80%
Overall21 of 2,435
Arrive within 3 min
94.5%
National average 84.3%
Stops cancelled
1.3%
National average 3.1%
Trains per day
130
47,339 scheduled stops
Data coverage
98.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 94.5%Sept 2025 · 95.7%Sept 2025 · 93.4%Oct 2025 · 94.4%Nov 2025 · 93.8%Dec 2025 · 93.8%Jan 2026 · 95.2%Feb 2026 · 94.4%Mar 2026 · 95.5%Apr 2026 · 95.6%May 2026 · 93%Jun 2026 · 92.5%Jul 2026 · 95.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202594.5%
Sept 202595.7%
Sept 202593.4%
Oct 202594.4%
Nov 202593.8%
Dec 202593.8%
Jan 202695.2%
Feb 202694.4%
Mar 202695.5%
Apr 202695.6%
May 202693%
Jun 202692.5%
Jul 202695.7%

Details

RegionLondon
Station facility ownerSoutheastern
Operators calling
Southeastern
Annual entries and exits1,067,284
Annual interchanges901
Scheduled stops47,339
Measured stops46,731