Stations · London
Canary WharfCWX
1 operator · Elizabeth line
98
Reliabilitybeats 94%
Cancellationsbeats 65%
Frequencybeats 95%
Connectivitybeats 79%
Overall45 of 2,435
Arrive within 3 min
94.1%
National average 84.3%
Stops cancelled
2.1%
National average 3.1%
Trains per day
312
113,375 scheduled stops
Data coverage
97.8%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 96.4% |
| Sept 2025 | 93.9% |
| Sept 2025 | 93.1% |
| Oct 2025 | 93.8% |
| Nov 2025 | 93.1% |
| Dec 2025 | 95.9% |
| Jan 2026 | 94.2% |
| Feb 2026 | 94.7% |
| Mar 2026 | 94.4% |
| Apr 2026 | 94.5% |
| May 2026 | 94% |
| Jun 2026 | 92.2% |
| Jul 2026 | 93.3% |
Details
| Region | London |
| Station facility owner | Elizabeth line |
| Operators calling | Elizabeth line |
| Annual entries and exits | 15,927,588 |
| Annual interchanges | 145 |
| Scheduled stops | 113,375 |
| Measured stops | 110,923 |