HGIYS
Stations · London

Canary WharfCWX

1 operator · Elizabeth line
98
Reliabilitybeats 94%
Cancellationsbeats 65%
Frequencybeats 95%
Connectivitybeats 79%
Overall45 of 2,435
Arrive within 3 min
94.1%
National average 84.3%
Stops cancelled
2.1%
National average 3.1%
Trains per day
312
113,375 scheduled stops
Data coverage
97.8%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 96.4%Sept 2025 · 93.9%Sept 2025 · 93.1%Oct 2025 · 93.8%Nov 2025 · 93.1%Dec 2025 · 95.9%Jan 2026 · 94.2%Feb 2026 · 94.7%Mar 2026 · 94.4%Apr 2026 · 94.5%May 2026 · 94%Jun 2026 · 92.2%Jul 2026 · 93.3%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202596.4%
Sept 202593.9%
Sept 202593.1%
Oct 202593.8%
Nov 202593.1%
Dec 202595.9%
Jan 202694.2%
Feb 202694.7%
Mar 202694.4%
Apr 202694.5%
May 202694%
Jun 202692.2%
Jul 202693.3%

Details

RegionLondon
Station facility ownerElizabeth line
Operators calling
Elizabeth line
Annual entries and exits15,927,588
Annual interchanges145
Scheduled stops113,375
Measured stops110,923