HGIYS
Stations · London

Crystal PalaceCYP

2 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground
98
Reliabilitybeats 97%
Cancellationsbeats 42%
Frequencybeats 96%
Connectivitybeats 93%
Overall59 of 2,435
Arrive within 3 min
95.1%
National average 84.3%
Stops cancelled
3%
National average 3.1%
Trains per day
326
118,810 scheduled stops
Data coverage
97%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 96.4%Sept 2025 · 96.2%Sept 2025 · 95.3%Oct 2025 · 95.6%Nov 2025 · 95.5%Dec 2025 · 95.2%Jan 2026 · 93.4%Feb 2026 · 95.3%Mar 2026 · 95.4%Apr 2026 · 95.2%May 2026 · 95.6%Jun 2026 · 94.1%Jul 2026 · 93%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202596.4%
Sept 202596.2%
Sept 202595.3%
Oct 202595.6%
Nov 202595.5%
Dec 202595.2%
Jan 202693.4%
Feb 202695.3%
Mar 202695.4%
Apr 202695.2%
May 202695.6%
Jun 202694.1%
Jul 202693%

Details

RegionLondon
Station facility ownerLondon Overground
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)London Overground
Annual entries and exits2,781,506
Annual interchanges156,806
Scheduled stops118,810
Measured stops115,216