HGIYS
Stations · East of England

Downham MarketDOW

1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
0
Reliabilitybeats 2%
Cancellationsbeats 1%
Frequencybeats 38%
Connectivitybeats 35%
Overall2,431 of 2,435
Arrive within 3 min
61.7%
National average 84.3%
Stops cancelled
7.7%
National average 3.1%
Trains per day
47
17,153 scheduled stops
Data coverage
92.1%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
40%50%60%70%80%90%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 43.8%Sept 2025 · 45.1%Sept 2025 · 54.6%Oct 2025 · 69.6%Nov 2025 · 74.7%Dec 2025 · 72.3%Jan 2026 · 63.7%Feb 2026 · 68.5%Mar 2026 · 67.5%Apr 2026 · 66.9%May 2026 · 59.2%Jun 2026 · 66.1%Jul 2026 · 49.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202543.8%
Sept 202545.1%
Sept 202554.6%
Oct 202569.6%
Nov 202574.7%
Dec 202572.3%
Jan 202663.7%
Feb 202668.5%
Mar 202667.5%
Apr 202666.9%
May 202659.2%
Jun 202666.1%
Jul 202649.7%

Details

RegionEast of England
Station facility ownerGovia Thameslink Railway (Great Northern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)
Annual entries and exits440,550
Annual interchanges0
Scheduled stops17,153
Measured stops15,794