Stations · East of England
Downham MarketDOW
1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
0
Reliabilitybeats 2%
Cancellationsbeats 1%
Frequencybeats 38%
Connectivitybeats 35%
Overall2,431 of 2,435
Arrive within 3 min
61.7%
National average 84.3%
Stops cancelled
7.7%
National average 3.1%
Trains per day
47
17,153 scheduled stops
Data coverage
92.1%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 43.8% |
| Sept 2025 | 45.1% |
| Sept 2025 | 54.6% |
| Oct 2025 | 69.6% |
| Nov 2025 | 74.7% |
| Dec 2025 | 72.3% |
| Jan 2026 | 63.7% |
| Feb 2026 | 68.5% |
| Mar 2026 | 67.5% |
| Apr 2026 | 66.9% |
| May 2026 | 59.2% |
| Jun 2026 | 66.1% |
| Jul 2026 | 49.7% |
Details
| Region | East of England |
| Station facility owner | Govia Thameslink Railway (Great Northern) |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR) |
| Annual entries and exits | 440,550 |
| Annual interchanges | 0 |
| Scheduled stops | 17,153 |
| Measured stops | 15,794 |