HGIYS
Stations · London

Edmonton GreenEDR

1 operator · London Overground
99
Reliabilitybeats 96%
Cancellationsbeats 82%
Frequencybeats 85%
Connectivitybeats 84%
Overall14 of 2,435
Arrive within 3 min
95%
National average 84.3%
Stops cancelled
1.6%
National average 3.1%
Trains per day
160
58,210 scheduled stops
Data coverage
98.4%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 96%Sept 2025 · 96.6%Sept 2025 · 96.3%Oct 2025 · 92.7%Nov 2025 · 93.8%Dec 2025 · 95.7%Jan 2026 · 96.6%Feb 2026 · 94.7%Mar 2026 · 95.8%Apr 2026 · 94.9%May 2026 · 95.9%Jun 2026 · 93.1%Jul 2026 · 92.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202596%
Sept 202596.6%
Sept 202596.3%
Oct 202592.7%
Nov 202593.8%
Dec 202595.7%
Jan 202696.6%
Feb 202694.7%
Mar 202695.8%
Apr 202694.9%
May 202695.9%
Jun 202693.1%
Jul 202692.2%

Details

RegionLondon
Station facility ownerLondon Overground
Operators calling
London Overground
Annual entries and exits3,486,764
Annual interchanges20,177
Scheduled stops58,210
Measured stops57,257