Stations · London
Edmonton GreenEDR
1 operator · London Overground
99
Reliabilitybeats 96%
Cancellationsbeats 82%
Frequencybeats 85%
Connectivitybeats 84%
Overall14 of 2,435
Arrive within 3 min
95%
National average 84.3%
Stops cancelled
1.6%
National average 3.1%
Trains per day
160
58,210 scheduled stops
Data coverage
98.4%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 96% |
| Sept 2025 | 96.6% |
| Sept 2025 | 96.3% |
| Oct 2025 | 92.7% |
| Nov 2025 | 93.8% |
| Dec 2025 | 95.7% |
| Jan 2026 | 96.6% |
| Feb 2026 | 94.7% |
| Mar 2026 | 95.8% |
| Apr 2026 | 94.9% |
| May 2026 | 95.9% |
| Jun 2026 | 93.1% |
| Jul 2026 | 92.2% |
Details
| Region | London |
| Station facility owner | London Overground |
| Operators calling | London Overground |
| Annual entries and exits | 3,486,764 |
| Annual interchanges | 20,177 |
| Scheduled stops | 58,210 |
| Measured stops | 57,257 |