HGIYS
Stations · Scotland

Falkirk GrahamstonFKG

3 operators · Caledonian Sleeper, London North Eastern Railway, ScotRail
98
Reliabilitybeats 78%
Cancellationsbeats 95%
Frequencybeats 71%
Connectivitybeats 96%
Overall40 of 2,435
Arrive within 3 min
90.1%
National average 84.3%
Stops cancelled
1%
National average 3.1%
Trains per day
105
38,358 scheduled stops
Data coverage
99%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 88.6%Sept 2025 · 92.3%Sept 2025 · 89.4%Oct 2025 · 85.9%Nov 2025 · 87.8%Dec 2025 · 89.7%Jan 2026 · 87.8%Feb 2026 · 92.9%Mar 2026 · 92%Apr 2026 · 91.2%May 2026 · 92.3%Jun 2026 · 91.8%Jul 2026 · 89.4%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202588.6%
Sept 202592.3%
Sept 202589.4%
Oct 202585.9%
Nov 202587.8%
Dec 202589.7%
Jan 202687.8%
Feb 202692.9%
Mar 202692%
Apr 202691.2%
May 202692.3%
Jun 202691.8%
Jul 202689.4%

Details

RegionScotland
Station facility ownerScotRail
Operators calling
Caledonian SleeperLondon North Eastern RailwayScotRail
Annual entries and exits611,856
Annual interchanges119,884
Scheduled stops38,358
Measured stops37,969