HGIYS
Stations · Scotland

Falkirk HighFKK

2 operators · Lumo (East Coast), ScotRail
97
Reliabilitybeats 88%
Cancellationsbeats 82%
Frequencybeats 67%
Connectivitybeats 84%
Overall65 of 2,435
Arrive within 3 min
93.3%
National average 84.3%
Stops cancelled
1.6%
National average 3.1%
Trains per day
90
32,877 scheduled stops
Data coverage
98.4%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 93.2%Sept 2025 · 94.6%Sept 2025 · 93%Oct 2025 · 90.2%Nov 2025 · 90.3%Dec 2025 · 93.2%Jan 2026 · 92.4%Feb 2026 · 95.4%Mar 2026 · 95%Apr 2026 · 94%May 2026 · 95%Jun 2026 · 93.3%Jul 2026 · 92.5%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202593.2%
Sept 202594.6%
Sept 202593%
Oct 202590.2%
Nov 202590.3%
Dec 202593.2%
Jan 202692.4%
Feb 202695.4%
Mar 202695%
Apr 202694%
May 202695%
Jun 202693.3%
Jul 202692.5%

Details

RegionScotland
Station facility ownerScotRail
Operators calling
Lumo (East Coast)ScotRail
Annual entries and exits773,200
Annual interchanges3,274
Scheduled stops32,877
Measured stops32,359