HGIYS
Stations · South East

Gerrards CrossGER

1 operator · Chiltern Railways
97
Reliabilitybeats 80%
Cancellationsbeats 86%
Frequencybeats 74%
Connectivitybeats 86%
Overall72 of 2,435
Arrive within 3 min
90.5%
National average 84.3%
Stops cancelled
1.5%
National average 3.1%
Trains per day
118
42,950 scheduled stops
Data coverage
98.5%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 88.9%Sept 2025 · 90.3%Sept 2025 · 92.1%Oct 2025 · 90.4%Nov 2025 · 88.9%Dec 2025 · 90.7%Jan 2026 · 91.8%Feb 2026 · 92.8%Mar 2026 · 93.4%Apr 2026 · 93%May 2026 · 89.8%Jun 2026 · 87.9%Jul 2026 · 86.4%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202588.9%
Sept 202590.3%
Sept 202592.1%
Oct 202590.4%
Nov 202588.9%
Dec 202590.7%
Jan 202691.8%
Feb 202692.8%
Mar 202693.4%
Apr 202693%
May 202689.8%
Jun 202687.9%
Jul 202686.4%

Details

RegionSouth East
Station facility ownerChiltern Railways
Operators calling
Chiltern Railways
Annual entries and exits1,102,694
Annual interchanges31,531
Scheduled stops42,950
Measured stops42,326