HGIYS
Stations · London

Grove ParkGRP

1 operator · Southeastern
100
Reliabilitybeats 90%
Cancellationsbeats 96%
Frequencybeats 91%
Connectivitybeats 91%
Overall2 of 2,435
Arrive within 3 min
93.2%
National average 84.3%
Stops cancelled
0.9%
National average 3.1%
Trains per day
205
74,562 scheduled stops
Data coverage
99.1%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 94.5%Sept 2025 · 94.1%Sept 2025 · 91.4%Oct 2025 · 92%Nov 2025 · 90.6%Dec 2025 · 93.3%Jan 2026 · 93.7%Feb 2026 · 93.1%Mar 2026 · 93.7%Apr 2026 · 95.2%May 2026 · 93.9%Jun 2026 · 92.5%Jul 2026 · 93.5%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202594.5%
Sept 202594.1%
Sept 202591.4%
Oct 202592%
Nov 202590.6%
Dec 202593.3%
Jan 202693.7%
Feb 202693.1%
Mar 202693.7%
Apr 202695.2%
May 202693.9%
Jun 202692.5%
Jul 202693.5%

Details

RegionLondon
Station facility ownerSoutheastern
Operators calling
Southeastern
Annual entries and exits2,296,634
Annual interchanges364,629
Scheduled stops74,562
Measured stops73,861