HGIYS
Stations · East of England

GraysGRY

1 operator · c2c
98
Reliabilitybeats 80%
Cancellationsbeats 86%
Frequencybeats 87%
Connectivitybeats 88%
Overall38 of 2,435
Arrive within 3 min
90.5%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
170
61,765 scheduled stops
Data coverage
98.5%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.4%Sept 2025 · 86.9%Sept 2025 · 88.8%Oct 2025 · 88.8%Nov 2025 · 90.9%Dec 2025 · 91.4%Jan 2026 · 92.3%Feb 2026 · 91.9%Mar 2026 · 92.8%Apr 2026 · 90.8%May 2026 · 91.6%Jun 2026 · 88.6%Jul 2026 · 89.6%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.4%
Sept 202586.9%
Sept 202588.8%
Oct 202588.8%
Nov 202590.9%
Dec 202591.4%
Jan 202692.3%
Feb 202691.9%
Mar 202692.8%
Apr 202690.8%
May 202691.6%
Jun 202688.6%
Jul 202689.6%

Details

RegionEast of England
Station facility ownerc2c
Operators calling
c2c
Annual entries and exits3,585,722
Annual interchanges105,963
Scheduled stops61,765
Measured stops60,849