HGIYS
Stations · London

Hither GreenHGR

1 operator · Southeastern
98
Reliabilitybeats 68%
Cancellationsbeats 90%
Frequencybeats 95%
Connectivitybeats 90%
Overall50 of 2,435
Arrive within 3 min
87.9%
National average 84.3%
Stops cancelled
1.3%
National average 3.1%
Trains per day
291
105,911 scheduled stops
Data coverage
98.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 90%Sept 2025 · 89.8%Sept 2025 · 84.7%Oct 2025 · 85.1%Nov 2025 · 84.7%Dec 2025 · 88.5%Jan 2026 · 88.4%Feb 2026 · 88%Mar 2026 · 89.3%Apr 2026 · 90.6%May 2026 · 87.2%Jun 2026 · 85.9%Jul 2026 · 89.6%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202590%
Sept 202589.8%
Sept 202584.7%
Oct 202585.1%
Nov 202584.7%
Dec 202588.5%
Jan 202688.4%
Feb 202688%
Mar 202689.3%
Apr 202690.6%
May 202687.2%
Jun 202685.9%
Jul 202689.6%

Details

RegionLondon
Station facility ownerSoutheastern
Operators calling
Southeastern
Annual entries and exits2,899,052
Annual interchanges212,143
Scheduled stops105,911
Measured stops104,491