HGIYS
Stations · East of England

IpswichIPS

1 operator · Greater Anglia
100
Reliabilitybeats 83%
Cancellationsbeats 94%
Frequencybeats 91%
Connectivitybeats 93%
Overall6 of 2,435
Arrive within 3 min
91.3%
National average 84.3%
Stops cancelled
1.1%
National average 3.1%
Trains per day
215
78,171 scheduled stops
Data coverage
98.9%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.5%Sept 2025 · 92%Sept 2025 · 88.3%Oct 2025 · 91.4%Nov 2025 · 89.8%Dec 2025 · 92.2%Jan 2026 · 93.3%Feb 2026 · 93.5%Mar 2026 · 93%Apr 2026 · 93.3%May 2026 · 92.8%Jun 2026 · 87.7%Jul 2026 · 87.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.5%
Sept 202592%
Sept 202588.3%
Oct 202591.4%
Nov 202589.8%
Dec 202592.2%
Jan 202693.3%
Feb 202693.5%
Mar 202693%
Apr 202693.3%
May 202692.8%
Jun 202687.7%
Jul 202687.7%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater Anglia
Annual entries and exits3,371,206
Annual interchanges761,485
Scheduled stops78,171
Measured stops77,310