HGIYS
Stations · London

London BridgeLBG

2 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), Southeastern
86
Reliabilitybeats 52%
Cancellationsbeats 49%
Frequencybeats 100%
Connectivitybeats 98%
Overall343 of 2,435
Arrive within 3 min
84.7%
National average 84.3%
Stops cancelled
2.7%
National average 3.1%
Trains per day
1,620
589,612 scheduled stops
Data coverage
97.2%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
75%80%85%90%95%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 86%Sept 2025 · 86.4%Sept 2025 · 84.2%Oct 2025 · 83%Nov 2025 · 80.1%Dec 2025 · 84.3%Jan 2026 · 84.1%Feb 2026 · 85.6%Mar 2026 · 87.4%Apr 2026 · 87.6%May 2026 · 85.8%Jun 2026 · 82.7%Jul 2026 · 82.5%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202586%
Sept 202586.4%
Sept 202584.2%
Oct 202583%
Nov 202580.1%
Dec 202584.3%
Jan 202684.1%
Feb 202685.6%
Mar 202687.4%
Apr 202687.6%
May 202685.8%
Jun 202682.7%
Jul 202682.5%

Details

RegionLondon
Station facility ownerNetwork Rail
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)Southeastern
Annual entries and exits54,685,648
Annual interchanges6,980,031
Scheduled stops589,612
Measured stops573,335