Stations · London
London BridgeLBG
2 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), Southeastern
86
Reliabilitybeats 52%
Cancellationsbeats 49%
Frequencybeats 100%
Connectivitybeats 98%
Overall343 of 2,435
Arrive within 3 min
84.7%
National average 84.3%
Stops cancelled
2.7%
National average 3.1%
Trains per day
1,620
589,612 scheduled stops
Data coverage
97.2%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 86% |
| Sept 2025 | 86.4% |
| Sept 2025 | 84.2% |
| Oct 2025 | 83% |
| Nov 2025 | 80.1% |
| Dec 2025 | 84.3% |
| Jan 2026 | 84.1% |
| Feb 2026 | 85.6% |
| Mar 2026 | 87.4% |
| Apr 2026 | 87.6% |
| May 2026 | 85.8% |
| Jun 2026 | 82.7% |
| Jul 2026 | 82.5% |
Details
| Region | London |
| Station facility owner | Network Rail |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR)Southeastern |
| Annual entries and exits | 54,685,648 |
| Annual interchanges | 6,980,031 |
| Scheduled stops | 589,612 |
| Measured stops | 573,335 |