Stations · London
LewishamLEW
1 operator · Southeastern
97
Reliabilitybeats 65%
Cancellationsbeats 81%
Frequencybeats 98%
Connectivitybeats 94%
Overall68 of 2,435
Arrive within 3 min
87.2%
National average 84.3%
Stops cancelled
1.6%
National average 3.1%
Trains per day
461
167,866 scheduled stops
Data coverage
98.4%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 89.2% |
| Sept 2025 | 88.4% |
| Sept 2025 | 83.9% |
| Oct 2025 | 85.3% |
| Nov 2025 | 85.7% |
| Dec 2025 | 88.5% |
| Jan 2026 | 88.2% |
| Feb 2026 | 87.3% |
| Mar 2026 | 89% |
| Apr 2026 | 89.3% |
| May 2026 | 85.6% |
| Jun 2026 | 84.7% |
| Jul 2026 | 88.1% |
Details
| Region | London |
| Station facility owner | Southeastern |
| Operators calling | Southeastern |
| Annual entries and exits | 7,023,970 |
| Annual interchanges | 1,504,910 |
| Scheduled stops | 167,866 |
| Measured stops | 165,124 |