HGIYS
Stations · East of England

LittleportLTP

1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
0
Reliabilitybeats 3%
Cancellationsbeats 1%
Frequencybeats 38%
Connectivitybeats 35%
Overall2,428 of 2,435
Arrive within 3 min
65.2%
National average 84.3%
Stops cancelled
7.7%
National average 3.1%
Trains per day
47
17,152 scheduled stops
Data coverage
92.2%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
40%50%60%70%80%90%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 50%Sept 2025 · 54.5%Sept 2025 · 58.3%Oct 2025 · 73.3%Nov 2025 · 76.5%Dec 2025 · 74.7%Jan 2026 · 66.1%Feb 2026 · 72.4%Mar 2026 · 70.7%Apr 2026 · 70%May 2026 · 63.4%Jun 2026 · 67%Jul 2026 · 50.7%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202550%
Sept 202554.5%
Sept 202558.3%
Oct 202573.3%
Nov 202576.5%
Dec 202574.7%
Jan 202666.1%
Feb 202672.4%
Mar 202670.7%
Apr 202670%
May 202663.4%
Jun 202667%
Jul 202650.7%

Details

RegionEast of England
Station facility ownerGovia Thameslink Railway (Great Northern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)
Annual entries and exits251,780
Annual interchanges0
Scheduled stops17,152
Measured stops15,809