Stations · South West
LuxulyanLUX
1 operator · Great Western Railway
0
Reliabilitybeats 14%
Cancellationsbeats 3%
Frequencybeats 7%
Connectivitybeats 35%
Overall2,434 of 2,435
Arrive within 3 min
61.1%
National average 84.3%
Stops cancelled
6.7%
National average 3.1%
Trains per day
14
4,943 scheduled stops
Data coverage
38.7%
Share of stops actually measured
Treat this score with caution. Only 38.7% of stops at Luxulyan are measured by the ORR, so its punctuality rests on a thin sample. The score is pulled toward the national average to compensate.
Punctuality over time
Aug 2025 to Jul 2026Details
| Region | South West |
| Station facility owner | Great Western Railway |
| Operators calling | Great Western Railway |
| Annual entries and exits | 3,196 |
| Annual interchanges | 0 |
| Scheduled stops | 4,943 |
| Measured stops | 1,913 |