Stations · East of England
LowestoftLWT
1 operator · Greater Anglia
99
Reliabilitybeats 99%
Cancellationsbeats 95%
Frequencybeats 58%
Connectivitybeats 83%
Overall27 of 2,435
Arrive within 3 min
97.2%
National average 84.3%
Stops cancelled
1%
National average 3.1%
Trains per day
70
25,370 scheduled stops
Data coverage
99%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 97.8% |
| Sept 2025 | 98.4% |
| Sept 2025 | 97.2% |
| Oct 2025 | 97.1% |
| Nov 2025 | 97.4% |
| Dec 2025 | 98.1% |
| Jan 2026 | 98.1% |
| Feb 2026 | 98.4% |
| Mar 2026 | 98% |
| Apr 2026 | 97.1% |
| May 2026 | 96.2% |
| Jun 2026 | 94.9% |
| Jul 2026 | 94.4% |
Details
| Region | East of England |
| Station facility owner | Greater Anglia |
| Operators calling | Greater Anglia |
| Annual entries and exits | 468,156 |
| Annual interchanges | 9,861 |
| Scheduled stops | 25,370 |
| Measured stops | 25,111 |