HGIYS
Stations · East of England

ManningtreeMNG

1 operator · Greater Anglia
99
Reliabilitybeats 82%
Cancellationsbeats 93%
Frequencybeats 82%
Connectivitybeats 90%
Overall29 of 2,435
Arrive within 3 min
91.4%
National average 84.3%
Stops cancelled
1.2%
National average 3.1%
Trains per day
142
51,680 scheduled stops
Data coverage
98.8%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 89.9%Sept 2025 · 87.9%Sept 2025 · 85.8%Oct 2025 · 91.6%Nov 2025 · 91.2%Dec 2025 · 91.9%Jan 2026 · 93.6%Feb 2026 · 94.4%Mar 2026 · 93%Apr 2026 · 92.5%May 2026 · 93.7%Jun 2026 · 89.6%Jul 2026 · 91.3%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202589.9%
Sept 202587.9%
Sept 202585.8%
Oct 202591.6%
Nov 202591.2%
Dec 202591.9%
Jan 202693.6%
Feb 202694.4%
Mar 202693%
Apr 202692.5%
May 202693.7%
Jun 202689.6%
Jul 202691.3%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater Anglia
Annual entries and exits1,043,404
Annual interchanges248,801
Scheduled stops51,680
Measured stops51,077