HGIYS
Stations · North West

MoorfieldsMRF

1 operator · Merseyrail
99
Reliabilitybeats 87%
Cancellationsbeats 64%
Frequencybeats 99%
Connectivitybeats 93%
Overall37 of 2,435
Arrive within 3 min
92.2%
National average 84.3%
Stops cancelled
2.2%
National average 3.1%
Trains per day
580
211,074 scheduled stops
Data coverage
97.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 92%Sept 2025 · 92%Sept 2025 · 92.8%Oct 2025 · 91.1%Nov 2025 · 90.5%Dec 2025 · 92.3%Jan 2026 · 91.6%Feb 2026 · 91.4%Mar 2026 · 93.1%Apr 2026 · 92.5%May 2026 · 93.9%Jun 2026 · 93.6%Jul 2026 · 91.5%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202592%
Sept 202592%
Sept 202592.8%
Oct 202591.1%
Nov 202590.5%
Dec 202592.3%
Jan 202691.6%
Feb 202691.4%
Mar 202693.1%
Apr 202692.5%
May 202693.9%
Jun 202693.6%
Jul 202691.5%

Details

RegionNorth West
Station facility ownerMerseyrail
Operators calling
Merseyrail
Annual entries and exits6,630,098
Annual interchanges851,735
Scheduled stops211,074
Measured stops206,281