HGIYS
Stations · London

London MaryleboneMYB

1 operator · Chiltern Railways
99
Reliabilitybeats 78%
Cancellationsbeats 89%
Frequencybeats 93%
Connectivitybeats 93%
Overall26 of 2,435
Arrive within 3 min
89.9%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
250
91,155 scheduled stops
Data coverage
98.6%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 90.3%Sept 2025 · 91.4%Sept 2025 · 91.4%Oct 2025 · 88%Nov 2025 · 87.6%Dec 2025 · 89.4%Jan 2026 · 90.3%Feb 2026 · 92.3%Mar 2026 · 92.2%Apr 2026 · 92%May 2026 · 89%Jun 2026 · 87.1%Jul 2026 · 87.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202590.3%
Sept 202591.4%
Sept 202591.4%
Oct 202588%
Nov 202587.6%
Dec 202589.4%
Jan 202690.3%
Feb 202692.3%
Mar 202692.2%
Apr 202692%
May 202689%
Jun 202687.1%
Jul 202687.2%

Details

RegionLondon
Station facility ownerChiltern Railways
Operators calling
Chiltern Railways
Annual entries and exits11,772,892
Annual interchanges1,036,405
Scheduled stops91,155
Measured stops89,907