HGIYS
Stations · East of England

NorwichNRW

2 operators · East Midlands Railway, Greater Anglia
99
Reliabilitybeats 78%
Cancellationsbeats 91%
Frequencybeats 92%
Connectivitybeats 96%
Overall15 of 2,435
Arrive within 3 min
90%
National average 84.3%
Stops cancelled
1.2%
National average 3.1%
Trains per day
237
86,232 scheduled stops
Data coverage
98.7%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.4%Sept 2025 · 92.5%Sept 2025 · 90.5%Oct 2025 · 90.3%Nov 2025 · 89.5%Dec 2025 · 89.6%Jan 2026 · 91.5%Feb 2026 · 92.1%Mar 2026 · 90%Apr 2026 · 90.1%May 2026 · 89.4%Jun 2026 · 87.4%Jul 2026 · 86.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.4%
Sept 202592.5%
Sept 202590.5%
Oct 202590.3%
Nov 202589.5%
Dec 202589.6%
Jan 202691.5%
Feb 202692.1%
Mar 202690%
Apr 202690.1%
May 202689.4%
Jun 202687.4%
Jul 202686.2%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
East Midlands RailwayGreater Anglia
Annual entries and exits4,556,674
Annual interchanges553,617
Scheduled stops86,232
Measured stops85,149