HGIYS
Stations · London

New CrossNWX

2 operators · London Overground, Southeastern
96
Reliabilitybeats 84%
Cancellationsbeats 46%
Frequencybeats 96%
Connectivitybeats 95%
Overall88 of 2,435
Arrive within 3 min
91.6%
National average 84.3%
Stops cancelled
2.9%
National average 3.1%
Trains per day
339
123,417 scheduled stops
Data coverage
97.1%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 93.5%Sept 2025 · 92.6%Sept 2025 · 91.4%Oct 2025 · 91.3%Nov 2025 · 90.6%Dec 2025 · 92.5%Jan 2026 · 91.2%Feb 2026 · 91.9%Mar 2026 · 91.9%Apr 2026 · 91.8%May 2026 · 91.9%Jun 2026 · 90.1%Jul 2026 · 90.8%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202593.5%
Sept 202592.6%
Sept 202591.4%
Oct 202591.3%
Nov 202590.6%
Dec 202592.5%
Jan 202691.2%
Feb 202691.9%
Mar 202691.9%
Apr 202691.8%
May 202691.9%
Jun 202690.1%
Jul 202690.8%

Details

RegionLondon
Station facility ownerSoutheastern
Operators calling
London OvergroundSoutheastern
Annual entries and exits3,180,844
Annual interchanges469,891
Scheduled stops123,417
Measured stops119,857