HGIYS
Stations · London

New Cross GateNXG

2 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground
97
Reliabilitybeats 89%
Cancellationsbeats 42%
Frequencybeats 97%
Connectivitybeats 93%
Overall82 of 2,435
Arrive within 3 min
92.9%
National average 84.3%
Stops cancelled
3%
National average 3.1%
Trains per day
374
136,278 scheduled stops
Data coverage
97%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 96.1%Sept 2025 · 94.1%Sept 2025 · 92.1%Oct 2025 · 91%Nov 2025 · 90.6%Dec 2025 · 93.8%Jan 2026 · 91.1%Feb 2026 · 93.1%Mar 2026 · 94%Apr 2026 · 93.1%May 2026 · 93.4%Jun 2026 · 92.6%Jul 2026 · 92.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202596.1%
Sept 202594.1%
Sept 202592.1%
Oct 202591%
Nov 202590.6%
Dec 202593.8%
Jan 202691.1%
Feb 202693.1%
Mar 202694%
Apr 202693.1%
May 202693.4%
Jun 202692.6%
Jul 202692.2%

Details

RegionLondon
Station facility ownerLondon Overground
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)London Overground
Annual entries and exits4,550,170
Annual interchanges129,133
Scheduled stops136,278
Measured stops132,176