Stations · London
New Cross GateNXG
2 operators · Great Northern, Thameslink, Southern and Gatwick Express (GTR), London Overground
97
Reliabilitybeats 89%
Cancellationsbeats 42%
Frequencybeats 97%
Connectivitybeats 93%
Overall82 of 2,435
Arrive within 3 min
92.9%
National average 84.3%
Stops cancelled
3%
National average 3.1%
Trains per day
374
136,278 scheduled stops
Data coverage
97%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 96.1% |
| Sept 2025 | 94.1% |
| Sept 2025 | 92.1% |
| Oct 2025 | 91% |
| Nov 2025 | 90.6% |
| Dec 2025 | 93.8% |
| Jan 2026 | 91.1% |
| Feb 2026 | 93.1% |
| Mar 2026 | 94% |
| Apr 2026 | 93.1% |
| May 2026 | 93.4% |
| Jun 2026 | 92.6% |
| Jul 2026 | 92.2% |
Details
| Region | London |
| Station facility owner | London Overground |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR)London Overground |
| Annual entries and exits | 4,550,170 |
| Annual interchanges | 129,133 |
| Scheduled stops | 136,278 |
| Measured stops | 132,176 |