Stations · London
London PaddingtonPAD
3 operators · Elizabeth line, Great Western Railway, Heathrow Express
82
Reliabilitybeats 52%
Cancellationsbeats 38%
Frequencybeats 100%
Connectivitybeats 99%
Overall441 of 2,435
Arrive within 3 min
84.7%
National average 84.3%
Stops cancelled
3.1%
National average 3.1%
Trains per day
1,158
421,530 scheduled stops
Data coverage
96.9%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 88% |
| Sept 2025 | 83.3% |
| Sept 2025 | 81.5% |
| Oct 2025 | 81.8% |
| Nov 2025 | 81.9% |
| Dec 2025 | 86.1% |
| Jan 2026 | 86.9% |
| Feb 2026 | 87.2% |
| Mar 2026 | 87.3% |
| Apr 2026 | 86.3% |
| May 2026 | 85.7% |
| Jun 2026 | 81.9% |
| Jul 2026 | 82.4% |
Details
| Region | London |
| Station facility owner | Network Rail |
| Operators calling | Elizabeth lineGreat Western RailwayHeathrow Express |
| Annual entries and exits | 69,897,084 |
| Annual interchanges | 3,848,407 |
| Scheduled stops | 421,530 |
| Measured stops | 408,266 |