Stations · South East
Princes RisboroughPRR
1 operator · Chiltern Railways
98
Reliabilitybeats 77%
Cancellationsbeats 94%
Frequencybeats 72%
Connectivitybeats 89%
Overall55 of 2,435
Arrive within 3 min
90%
National average 84.3%
Stops cancelled
1.1%
National average 3.1%
Trains per day
109
39,562 scheduled stops
Data coverage
98.9%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 88% |
| Sept 2025 | 88.8% |
| Sept 2025 | 90.8% |
| Oct 2025 | 89.6% |
| Nov 2025 | 87.8% |
| Dec 2025 | 91% |
| Jan 2026 | 92.4% |
| Feb 2026 | 92.5% |
| Mar 2026 | 92.9% |
| Apr 2026 | 92.3% |
| May 2026 | 87.7% |
| Jun 2026 | 89.3% |
| Jul 2026 | 85.5% |
Details
| Region | South East |
| Station facility owner | Chiltern Railways |
| Operators calling | Chiltern Railways |
| Annual entries and exits | 513,436 |
| Annual interchanges | 113,434 |
| Scheduled stops | 39,562 |
| Measured stops | 39,138 |