Stations · East of England
PitseaPSE
1 operator · c2c
99
Reliabilitybeats 81%
Cancellationsbeats 84%
Frequencybeats 89%
Connectivitybeats 89%
Overall33 of 2,435
Arrive within 3 min
90.8%
National average 84.3%
Stops cancelled
1.5%
National average 3.1%
Trains per day
190
69,006 scheduled stops
Data coverage
98.5%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 92.4% |
| Sept 2025 | 87% |
| Sept 2025 | 88.4% |
| Oct 2025 | 87.5% |
| Nov 2025 | 90.8% |
| Dec 2025 | 89.8% |
| Jan 2026 | 93.2% |
| Feb 2026 | 91.3% |
| Mar 2026 | 94.3% |
| Apr 2026 | 91.5% |
| May 2026 | 92.8% |
| Jun 2026 | 89.9% |
| Jul 2026 | 90.7% |
Details
| Region | East of England |
| Station facility owner | c2c |
| Operators calling | c2c |
| Annual entries and exits | 1,143,894 |
| Annual interchanges | 191,581 |
| Scheduled stops | 69,006 |
| Measured stops | 67,957 |