Stations · Wales
RadyrRDR
1 operator · Transport for Wales
98
Reliabilitybeats 86%
Cancellationsbeats 74%
Frequencybeats 92%
Connectivitybeats 87%
Overall41 of 2,435
Arrive within 3 min
92.1%
National average 84.3%
Stops cancelled
1.8%
National average 3.1%
Trains per day
238
86,714 scheduled stops
Data coverage
98.2%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 91.2% |
| Sept 2025 | 94.1% |
| Sept 2025 | 90.2% |
| Oct 2025 | 91% |
| Nov 2025 | 88.3% |
| Dec 2025 | 89.3% |
| Jan 2026 | 93.5% |
| Feb 2026 | 93.2% |
| Mar 2026 | 94.6% |
| Apr 2026 | 93.9% |
| May 2026 | 93.5% |
| Jun 2026 | 92.3% |
| Jul 2026 | 91.2% |
Details
| Region | Wales |
| Station facility owner | Transport for Wales |
| Operators calling | Transport for Wales |
| Annual entries and exits | 450,356 |
| Annual interchanges | 67,009 |
| Scheduled stops | 86,714 |
| Measured stops | 85,121 |