HGIYS
Stations · Wales

RadyrRDR

1 operator · Transport for Wales
98
Reliabilitybeats 86%
Cancellationsbeats 74%
Frequencybeats 92%
Connectivitybeats 87%
Overall41 of 2,435
Arrive within 3 min
92.1%
National average 84.3%
Stops cancelled
1.8%
National average 3.1%
Trains per day
238
86,714 scheduled stops
Data coverage
98.2%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 91.2%Sept 2025 · 94.1%Sept 2025 · 90.2%Oct 2025 · 91%Nov 2025 · 88.3%Dec 2025 · 89.3%Jan 2026 · 93.5%Feb 2026 · 93.2%Mar 2026 · 94.6%Apr 2026 · 93.9%May 2026 · 93.5%Jun 2026 · 92.3%Jul 2026 · 91.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202591.2%
Sept 202594.1%
Sept 202590.2%
Oct 202591%
Nov 202588.3%
Dec 202589.3%
Jan 202693.5%
Feb 202693.2%
Mar 202694.6%
Apr 202693.9%
May 202693.5%
Jun 202692.3%
Jul 202691.2%

Details

RegionWales
Station facility ownerTransport for Wales
Operators calling
Transport for Wales
Annual entries and exits450,356
Annual interchanges67,009
Scheduled stops86,714
Measured stops85,121