Stations · East of England
Southend CentralSOC
1 operator · c2c
98
Reliabilitybeats 75%
Cancellationsbeats 89%
Frequencybeats 91%
Connectivitybeats 81%
Overall52 of 2,435
Arrive within 3 min
89.4%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
209
76,047 scheduled stops
Data coverage
98.6%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 89.8% |
| Sept 2025 | 84.4% |
| Sept 2025 | 89% |
| Oct 2025 | 88.4% |
| Nov 2025 | 90.9% |
| Dec 2025 | 86.1% |
| Jan 2026 | 90.9% |
| Feb 2026 | 91.5% |
| Mar 2026 | 92.9% |
| Apr 2026 | 89.3% |
| May 2026 | 91.2% |
| Jun 2026 | 88.9% |
| Jul 2026 | 87.7% |
Details
| Region | East of England |
| Station facility owner | c2c |
| Operators calling | c2c |
| Annual entries and exits | 2,242,080 |
| Annual interchanges | 1,934 |
| Scheduled stops | 76,047 |
| Measured stops | 75,004 |