HGIYS
Stations · London

Stratford (London)SRA

4 operators · Elizabeth line, Greater Anglia, London Overground, c2c
91
Reliabilitybeats 77%
Cancellationsbeats 26%
Frequencybeats 100%
Connectivitybeats 99%
Overall232 of 2,435
Arrive within 3 min
89.5%
National average 84.3%
Stops cancelled
3.7%
National average 3.1%
Trains per day
1,072
390,198 scheduled stops
Data coverage
96.3%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 92%Sept 2025 · 88.6%Sept 2025 · 88.4%Oct 2025 · 88.2%Nov 2025 · 88.1%Dec 2025 · 91.4%Jan 2026 · 89.8%Feb 2026 · 91.8%Mar 2026 · 90.7%Apr 2026 · 89.7%May 2026 · 90.2%Jun 2026 · 88%Jul 2026 · 86.9%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202592%
Sept 202588.6%
Sept 202588.4%
Oct 202588.2%
Nov 202588.1%
Dec 202591.4%
Jan 202689.8%
Feb 202691.8%
Mar 202690.7%
Apr 202689.7%
May 202690.2%
Jun 202688%
Jul 202686.9%

Details

RegionLondon
Station facility ownerElizabeth line
Operators calling
Elizabeth lineGreater AngliaLondon Overgroundc2c
Annual entries and exits51,473,518
Annual interchanges4,873,825
Scheduled stops390,198
Measured stops375,625