HGIYS
Stations · Scotland

StirlingSTG

4 operators · Caledonian Sleeper, London North Eastern Railway, Lumo (West Coast), ScotRail
99
Reliabilitybeats 76%
Cancellationsbeats 89%
Frequencybeats 91%
Connectivitybeats 99%
Overall28 of 2,435
Arrive within 3 min
89.4%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
216
78,670 scheduled stops
Data coverage
98.6%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 88.6%Sept 2025 · 92.1%Sept 2025 · 88%Oct 2025 · 85.7%Nov 2025 · 87.7%Dec 2025 · 88.7%Jan 2026 · 86.6%Feb 2026 · 91.6%Mar 2026 · 91.1%Apr 2026 · 90.1%May 2026 · 92.6%Jun 2026 · 90.3%Jul 2026 · 89.2%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202588.6%
Sept 202592.1%
Sept 202588%
Oct 202585.7%
Nov 202587.7%
Dec 202588.7%
Jan 202686.6%
Feb 202691.6%
Mar 202691.1%
Apr 202690.1%
May 202692.6%
Jun 202690.3%
Jul 202689.2%

Details

RegionScotland
Station facility ownerScotRail
Operators calling
Caledonian SleeperLondon North Eastern RailwayLumo (West Coast)ScotRail
Annual entries and exits2,527,778
Annual interchanges462,222
Scheduled stops78,670
Measured stops77,584