Stations · London
Seven SistersSVS
2 operators · Greater Anglia, London Overground
100
Reliabilitybeats 97%
Cancellationsbeats 86%
Frequencybeats 86%
Connectivitybeats 79%
Overall13 of 2,435
Arrive within 3 min
95.2%
National average 84.3%
Stops cancelled
1.5%
National average 3.1%
Trains per day
168
61,094 scheduled stops
Data coverage
98.5%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 95.3% |
| Sept 2025 | 95.7% |
| Sept 2025 | 96.2% |
| Oct 2025 | 92% |
| Nov 2025 | 93.2% |
| Dec 2025 | 95.6% |
| Jan 2026 | 97.4% |
| Feb 2026 | 95.4% |
| Mar 2026 | 96% |
| Apr 2026 | 95.8% |
| May 2026 | 95.9% |
| Jun 2026 | 94% |
| Jul 2026 | 94.1% |
Details
| Region | London |
| Station facility owner | London Overground |
| Operators calling | Greater AngliaLondon Overground |
| Annual entries and exits | 8,394,182 |
| Annual interchanges | 17 |
| Scheduled stops | 61,094 |
| Measured stops | 60,182 |