HGIYS
Stations · London

Thornton HeathTTH

1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
96
Reliabilitybeats 92%
Cancellationsbeats 47%
Frequencybeats 90%
Connectivitybeats 84%
Overall94 of 2,435
Arrive within 3 min
93.9%
National average 84.3%
Stops cancelled
2.8%
National average 3.1%
Trains per day
197
71,557 scheduled stops
Data coverage
97%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 95%Sept 2025 · 94.7%Sept 2025 · 93.5%Oct 2025 · 93.3%Nov 2025 · 93.4%Dec 2025 · 92.9%Jan 2026 · 92.6%Feb 2026 · 94%Mar 2026 · 93.7%Apr 2026 · 94.8%May 2026 · 94.1%Jun 2026 · 93.9%Jul 2026 · 94.1%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202595%
Sept 202594.7%
Sept 202593.5%
Oct 202593.3%
Nov 202593.4%
Dec 202592.9%
Jan 202692.6%
Feb 202694%
Mar 202693.7%
Apr 202694.8%
May 202694.1%
Jun 202693.9%
Jul 202694.1%

Details

RegionLondon
Station facility ownerGovia Thameslink Railway (Southern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)
Annual entries and exits2,432,008
Annual interchanges15,190
Scheduled stops71,557
Measured stops69,391