Stations · London
Thornton HeathTTH
1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
96
Reliabilitybeats 92%
Cancellationsbeats 47%
Frequencybeats 90%
Connectivitybeats 84%
Overall94 of 2,435
Arrive within 3 min
93.9%
National average 84.3%
Stops cancelled
2.8%
National average 3.1%
Trains per day
197
71,557 scheduled stops
Data coverage
97%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 95% |
| Sept 2025 | 94.7% |
| Sept 2025 | 93.5% |
| Oct 2025 | 93.3% |
| Nov 2025 | 93.4% |
| Dec 2025 | 92.9% |
| Jan 2026 | 92.6% |
| Feb 2026 | 94% |
| Mar 2026 | 93.7% |
| Apr 2026 | 94.8% |
| May 2026 | 94.1% |
| Jun 2026 | 93.9% |
| Jul 2026 | 94.1% |
Details
| Region | London |
| Station facility owner | Govia Thameslink Railway (Southern) |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR) |
| Annual entries and exits | 2,432,008 |
| Annual interchanges | 15,190 |
| Scheduled stops | 71,557 |
| Measured stops | 69,391 |