HGIYS
Stations · London

UpminsterUPM

2 operators · London Overground, c2c
100
Reliabilitybeats 93%
Cancellationsbeats 87%
Frequencybeats 94%
Connectivitybeats 96%
Overall1 of 2,435
Arrive within 3 min
94.1%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
286
104,104 scheduled stops
Data coverage
98.5%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 94.8%Sept 2025 · 91.9%Sept 2025 · 93.6%Oct 2025 · 93%Nov 2025 · 93.8%Dec 2025 · 91%Jan 2026 · 95.9%Feb 2026 · 95.6%Mar 2026 · 95.7%Apr 2026 · 94.8%May 2026 · 94.7%Jun 2026 · 93.6%Jul 2026 · 94.1%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202594.8%
Sept 202591.9%
Sept 202593.6%
Oct 202593%
Nov 202593.8%
Dec 202591%
Jan 202695.9%
Feb 202695.6%
Mar 202695.7%
Apr 202694.8%
May 202694.7%
Jun 202693.6%
Jul 202694.1%

Details

RegionLondon
Station facility ownerc2c
Operators calling
London Overgroundc2c
Annual entries and exits5,020,900
Annual interchanges811,429
Scheduled stops104,104
Measured stops102,551